Sample Applications
Initial situation before the installation Chemiepark Bitterfeld
In the pipe-line system for transportation of ground water hard sediments of inorganic material have formed up to 35 - 47 mm within a few months time. The pumps operate maximum 10 days after that they get exchanged and cleaned. When commissioning the Fluid-Liner® the piping system was not cleaned mechanically. |
Initial situation biomass power plant Friedersdorf
Situation before installation
Situation before installation sewage-treatment plant Langenbrahm (Ruhrverband)
Hard deposits of calcium carbonate with a strong tressing and a high degree of cross-section contraction, almost up to total clogging. The wastewater pump is turned off by means of a pressure switch. The pipeline has been chemically cleaned before the installation of the protective induction system. |